Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2015 |
Principal Product | Pewter and zinc alloy emblems |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 3,000,000 Pieces |
Production Hrs. Annual | 2,690 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,355 | 648,720 | kWh | $0.05 |
Electricity Demand | $10,922 | 1,969 | kW-months/year | $5.55 |
Natural Gas | $2,144 | 238 | MMBtu | $9.01 |
TOTAL ENERGY COSTS | $47,421 | |||
RECOMMENDED SAVINGS* | $11,500 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,650 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $8,400 Cost: $9,800 |
- | - | - | - | - | - | $8,400 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,650 Cost: $580 |
$985 | 18,410 | $455 | 82 | - | - | $210 | - |
$985 18,410 kWh |
$455 82 kW-months/year |
- - MMBtu |
$210 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6123 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS |
Savings: $1,225 Cost: - |
- | - | - | - | $1,225 | 170 | - | - |
- - kWh |
- - kW-months/year |
$1,225 170 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $125 Cost: $30 |
$85 | 1,560 | $40 | 7 | - | - | - | - |
$85 1,560 kWh |
$40 7 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $100 Cost: $140 |
$95 | 1,765 | $5 | 1 | - | - | - | - |
$95 1,765 kWh |
$5 1 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,500 Cost: $10,550 |
$1,165 | 21,735 | $500 | 90 | $1,225 | 170 | $8,610 | - | $1,165 21,735 kWh |
$500 90 kW-months/year |
$1,225 170 MMBtu |
$8,610 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,650 Cost: $580 |
$985 | 18,410 | $455 | 82 | - | - | $210 | - | $985 18,410 kWh |
$455 82 kW-months/year |
- - MMBtu |
$210 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |