Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2018 |
Principal Product | foamglass insulation |
NAICS | 327211 - Flat Glass Manufacturing |
SIC | 3211 - Flat Glass |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 76,487 |
Annual Production | 17,170 Thousand Feet |
Production Hrs. Annual | 7,899 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $342,148 | 8,530,662 | kWh | $0.04 |
Electricity Demand | $202,959 | 20,457 | kW-months/year | $9.92 |
Electricity Fees | $1,987 | - | $ | - |
Natural Gas | $288,463 | 78,591 | MMBtu | $3.67 |
TOTAL ENERGY COSTS | $835,557 | |||
RECOMMENDED SAVINGS* | $264,350 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $83,840 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $173,300 Cost: $721,800 |
$126,500 | 3,167,000 | $78,400 | 6,972 | $(-31,600) | - | - | - |
$126,500 3,167,000 kWh |
$78,400 6,972 kW-months/year |
$(-31,600) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $71,530 Cost: $81,610 |
- | - | $71,530 | 6,358 | - | - | - | - |
- - kWh |
$71,530 6,358 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,060 Cost: $1,000 |
$5,590 | 139,800 | $3,470 | 308 | - | - | - | - |
$5,590 139,800 kWh |
$3,470 308 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,210 Cost: $22 |
$3,960 | 99,000 | $3,250 | 289 | - | - | - | - |
$3,960 99,000 kWh |
$3,250 289 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $2,740 Cost: - |
- | - | - | - | - | - | $2,740 | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,740 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $510 Cost: $595 |
$240 | 5,950 | $270 | 24 | - | - | - | - |
$240 5,950 kWh |
$270 24 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $264,350 Cost: $805,027 |
$136,290 | 3,411,750 | $156,920 | 13,951 | $(-31,600) | - | $2,740 | - | $136,290 3,411,750 kWh |
$156,920 13,951 kW-months/year |
$(-31,600) - $ |
$2,740 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $83,840 Cost: $83,205 |
$5,830 | 145,750 | $75,270 | 6,690 | - | - | $2,740 | - | $5,830 145,750 kWh |
$75,270 6,690 kW-months/year |
- - $ |
$2,740 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Ancillary Material Cost | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Ancillary Material Cost | One-time Revenue or Avoided Cost |