Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2022
Principal Product Marine engines, steam turbines, gas turbines
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 130,000
Annual Production 1,000 Pieces
Production Hrs. Annual 2,214
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,760 1,236,960 kWh $0.05
Electricity Demand $35,742 4,407 kW-months/year $8.11
Electricity Fees $9,320 - $ -
Natural Gas $9,825 886 MMBtu $11.09
TOTAL ENERGY COSTS $121,647
RECOMMENDED SAVINGS* $52,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $462
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$42,809
Cost:
$2,862
- - - - $7,449 - $35,360 - -
-
kWh
-
-
kW-months/year
$7,449
-
$
$35,360
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,294
Cost:
$18,267
- - $7,294 900 - - - - -
-
kWh
$7,294
900
kW-months/year
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$277
Cost:
$972
$137 2,544 $140 17 - - - - $137
2,544
kWh
$140
17
kW-months/year
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$185
Cost:
$300
$92 1,696 $93 11 - - - - $92
1,696
kWh
$93
11
kW-months/year
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$650
Cost:
$1,795
$650 12,031 - - - - - - $650
12,031
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$348
Cost:
$750
$173 3,200 $175 22 - - - - $173
3,200
kWh
$175
22
kW-months/year
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$580
Cost:
$40
$250 4,700 $330 41 - - - - $250
4,700
kWh
$330
41
kW-months/year
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$120
Cost:
$261
$120 2,200 - - - - - - $120
2,200
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$52,263
Cost:
$25,247
$1,422 26,371 $8,032 991 $7,449 - $35,360 - $1,422
26,371
kWh
$8,032
991
kW-months/year
$7,449
-
$
$35,360
-
$
TOTAL IMPLEMENTED Savings:
$462
Cost:
$1,272
$229 4,240 $233 28 - - - - $229
4,240
kWh
$233
28
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost