IAC Assessment: AM0855
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0855
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2022
Principal Product Conveyors
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 120,000
Annual Production 3,500,000 Tons
Production Hrs. Annual 3,050
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,311 760,037 kWh $0.05
Electricity Demand $37,440 3,877 kW-months/year $9.66
Electricity Fees $6,469 - $ -
TOTAL ENERGY COSTS $85,220
RECOMMENDED SAVINGS* $48,632 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,370
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$32,345
Cost:
$5,000
- - - - $6,469 - $25,876 - -
-
kWh
-
-
kW-months/year
$6,469
-
$
$25,876
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$7,487
Cost:
$13,455
- - $7,487 775 - - - - -
-
kWh
$7,487
775
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,775
Cost:
$2,575
$2,005 37,140 $1,770 183 - - - - $2,005
37,140
kWh
$1,770
183
kW-months/year
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,135
Cost:
-
$1,130 21,010 $1,005 104 - - - - $1,130
21,010
kWh
$1,005
104
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,650
Cost:
$1,000
$880 16,240 $770 80 - - - - $880
16,240
kWh
$770
80
kW-months/year
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$830
Cost:
$2,100
$830 15,340 - - - - - - $830
15,340
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$410
Cost:
$1,085
$410 7,601 - - - - - - $410
7,601
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$48,632
Cost:
$25,215
$5,255 97,331 $11,032 1,142 $6,469 - $25,876 - $5,255
97,331
kWh
$11,032
1,142
kW-months/year
$6,469
-
$
$25,876
-
$
TOTAL IMPLEMENTED Savings:
$37,370
Cost:
$9,185
$3,250 60,191 $1,775 184 $6,469 - $25,876 - $3,250
60,191
kWh
$1,775
184
kW-months/year
$6,469
-
$
$25,876
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost