IAC logo
IAC Assessment: AM0856
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0856
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2022
Principal Product Air conditioning equipment
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 170
Plant Area (Sq.Ft.) 125,000
Annual Production 12,173 Pieces
Production Hrs. Annual 4,250
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,450 2,548,492 kWh $0.08
Electricity Fees $3,343 - $ -
Natural Gas $5,966 552 MMBtu $10.81
TOTAL ENERGY COSTS $208,759
RECOMMENDED SAVINGS* $31,560 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,770
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,035
Cost:
$2,100
$8,350 107,000 $3,685 311 - - $8,350
107,000
kWh
$3,685
311
kW-months/year
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,360
Cost:
-
$9,360 120,000 - - - - $9,360
120,000
kWh
-
-
kW-months/year
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,410
Cost:
$1,000
$4,410 56,530 - - - - $4,410
56,530
kWh
-
-
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,745
Cost:
$2,528
$1,915 24,554 $830 70 - - $1,915
24,554
kWh
$830
70
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,790
Cost:
$2,520
$1,790 22,960 - - - - $1,790
22,960
kWh
-
-
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$675
Cost:
$1,275
$675 8,640 - - - - $675
8,640
kWh
-
-
kW-months/year
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$545
Cost:
-
- - - - $545 - -
-
kWh
-
-
kW-months/year
$545
-
$
TOTAL RECOMMENDED Savings:
$31,560
Cost:
$9,423
$26,500 339,684 $4,515 381 $545 - $26,500
339,684
kWh
$4,515
381
kW-months/year
$545
-
$
TOTAL IMPLEMENTED Savings:
$13,770
Cost:
$1,000
$13,770 176,530 - - - - $13,770
176,530
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees