IAC Assessment: AM0859
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0859
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2022
Principal Product Chemicals
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 150,000
Annual Production 200,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $380,567 9,718,573 kWh $0.04
Electricity Demand $144,070 17,556 kW-months/year $8.21
Electricity Fees $3,644 - $ -
Natural Gas $1,636,381 252,899 MMBtu $6.47
TOTAL ENERGY COSTS $2,164,662
RECOMMENDED SAVINGS* $437,918 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $357,150
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$355,500
Cost:
$15,000
- - - - - - - - $96,300 - $259,200 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$96,300
-
$
$259,200
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$42,200
Cost:
$2,460
- - - - - - $42,200 6,520 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$42,200
6,520
MMBtu
-
-
$
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$28,000
Cost:
$4,920
- - - - - - $28,000 4,330 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$28,000
4,330
MMBtu
-
-
$
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,300
Cost:
$36,700
- - $8,300 1,007 - - - - - - - - -
-
kWh
$8,300
1,007
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,210
Cost:
$40
$1,690 43,300 $520 63 - - - - - - - - $1,690
43,300
kWh
$520
63
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,650
Cost:
$160
$1,025 26,300 $625 76 - - - - - - - - $1,025
26,300
kWh
$625
76
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$58
Cost:
-
- - - - $58 - - - - - - - -
-
kWh
-
-
kW-months/year
$58
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$437,918
Cost:
$59,280
$2,715 69,600 $9,445 1,146 $58 - $70,200 10,850 $96,300 - $259,200 - $2,715
69,600
kWh
$9,445
1,146
kW-months/year
$58
-
$
$70,200
10,850
MMBtu
$96,300
-
$
$259,200
-
$
TOTAL IMPLEMENTED Savings:
$357,150
Cost:
$15,160
$1,025 26,300 $625 76 - - - - $96,300 - $259,200 - $1,025
26,300
kWh
$625
76
kW-months/year
-
-
$
-
-
MMBtu
$96,300
-
$
$259,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost