Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2024
Principal Product School students
NAICS 611110 - Elementary and Secondary Schools
SIC 8211 - Elementary And Secondary Schools
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 66,250
Annual Production 100 Units
Production Hrs. Annual 3,377
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,300 548,240 kWh $0.04
Electricity Demand $39,771 3,003 kW-months/year $13.24
Natural Gas $8,650 818 MMBtu $10.57
TOTAL ENERGY COSTS $71,721
RECOMMENDED SAVINGS* $33,701 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$903
Cost:
$35,477
$561 13,208 - - $342 32 $561
13,208
kWh
-
-
kW-months/year
$342
32
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$20,630
Cost:
$460,200
$18,365 432,124 $2,265 171 - - $18,365
432,124
kWh
$2,265
171
kW-months/year
-
-
MMBtu
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$6,640
Cost:
$7,500
$4,398 103,494 - - $2,242 212 $4,398
103,494
kWh
-
-
kW-months/year
$2,242
212
MMBtu
04: 2.1132 REPAIR FAULTY LOUVERS AND DAMPERS Savings:
$4,125
Cost:
$9,000
$190 4,462 - - $3,935 372 $190
4,462
kWh
-
-
kW-months/year
$3,935
372
MMBtu
05: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$1,403
Cost:
$1,000
$335 7,867 - - $1,068 101 $335
7,867
kWh
-
-
kW-months/year
$1,068
101
MMBtu
TOTAL RECOMMENDED Savings:
$33,701
Cost:
$513,177
$23,849 561,155 $2,265 171 $7,587 717 $23,849
561,155
kWh
$2,265
171
kW-months/year
$7,587
717
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas