IAC logo
IAC Assessment: AM0936
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0936
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2025
Principal Product Plastic Bottles
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 75,000
Annual Production 90,000,000 Pieces
Production Hrs. Annual 8,230
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $780,660 19,601,806 kWh $0.04
Electricity Demand $497,988 41,650 kW-months/year $11.96
Electricity Fees $8,133 - $ -
TOTAL ENERGY COSTS $1,286,781
RECOMMENDED SAVINGS* $281,902 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$104,000
Cost:
$115,000
- - $104,000 6,976 - - -
-
kWh
$104,000
6,976
kW-months/year
-
-
Tgal
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$62,000
Cost:
$644,000
$37,500 938,000 $24,500 1,640 - - $37,500
938,000
kWh
$24,500
1,640
kW-months/year
-
-
Tgal
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$45,840
Cost:
$1,490
- - - - $45,840 3,694 -
-
kWh
-
-
kW-months/year
$45,840
3,694
Tgal
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$35,490
Cost:
$397,200
$21,330 546,870 $14,160 950 - - $21,330
546,870
kWh
$14,160
950
kW-months/year
-
-
Tgal
05: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$26,345
Cost:
$418,850
$15,507 397,633 $10,838 726 - - $15,507
397,633
kWh
$10,838
726
kW-months/year
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,227
Cost:
$30,000
$8,227 206,192 - - - - $8,227
206,192
kWh
-
-
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$281,902
Cost:
$1,606,540
$82,564 2,088,695 $153,498 10,292 $45,840 3,694 $82,564
2,088,695
kWh
$153,498
10,292
kW-months/year
$45,840
3,694
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage