IAC logo
IAC Assessment: AM0943
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0943
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2025
Principal Product Hot Dip Galvanizing
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 93
Plant Area (Sq.Ft.) 75,000
Annual Production 80,000,000 Pounds
Production Hrs. Annual 8,320
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,533 1,066,700 kWh $0.04
Electricity Demand $30,565 3,366 kW-months/year $9.08
Electricity Fees $3,575 - $ -
Natural Gas $132,759 56,900 MMBtu $2.33
TOTAL ENERGY COSTS $208,432
RECOMMENDED SAVINGS* $144,454 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$43,210
Cost:
$493,838
$43,210 1,107,965 - - - - - - - - $43,210
1,107,965
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$25,900
Cost:
$50,000
- - - - - - $25,900 10,800 - - -
-
kWh
-
-
kW-months/year
-
-
$
$25,900
10,800
MMBtu
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$46,500
Cost:
$15,000
- - - - $11,140 - - - $35,360 - -
-
kWh
-
-
kW-months/year
$11,140
-
$
-
-
MMBtu
$35,360
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,550
Cost:
-
- - - - - - $8,550 3,660 - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,550
3,660
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,831
Cost:
$85
$4,090 104,871 $1,741 192 - - - - - - $4,090
104,871
kWh
$1,741
192
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$5,170
Cost:
$170
- - - - - - $5,170 2,218 - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,170
2,218
MMBtu
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$4,270
Cost:
$6,012
- - - - - - $4,270 1,832 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,270
1,832
MMBtu
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$539
Cost:
-
$310 7,947 $229 25 - - - - - - $310
7,947
kWh
$229
25
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$2,414
Cost:
$585
$1,367 35,040 $1,047 115 - - - - - - $1,367
35,040
kWh
$1,047
115
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,290
Cost:
-
$930 23,837 $360 40 - - - - - - $930
23,837
kWh
$360
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$780
Cost:
$1,869
- - - - - - $780 334 - - -
-
kWh
-
-
kW-months/year
-
-
$
$780
334
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$144,454
Cost:
$567,559
$49,907 1,279,660 $3,377 372 $11,140 - $44,670 18,844 $35,360 - $49,907
1,279,660
kWh
$3,377
372
kW-months/year
$11,140
-
$
$44,670
18,844
MMBtu
$35,360
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost