IAC logo
IAC Assessment: AR0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Industrial Cleaning Equipment
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 220
Plant Area (Sq.Ft.) 230,000
Annual Production 116,000 Pieces
Production Hrs. Annual 2,550
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,803 2,927,608 kWh $0.04
Electricity Demand $51,833 8,869 kW-months/year $5.84
Natural Gas $85,672 18,191 MMBtu $4.71
TOTAL ENERGY COSTS $273,102
RECOMMENDED SAVINGS* $136,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $114,071
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,372
Cost:
$186
$1,304 37,222 $1,068 183 - - - - - - - - $1,304
37,222
kWh
$1,068
183
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,289
Cost:
$2,535
- - - - $4,289 774 - - - - - - -
-
kWh
-
-
kW-months/year
$4,289
774
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,680
Cost:
$350
$1,127 32,239 $553 95 - - - - - - - - $1,127
32,239
kWh
$553
95
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$357
Cost:
$2,695
$357 10,258 - - - - - - - - - - $357
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$13,814
Cost:
$6,800
$(-319) (-6,155) - - - - $14,133 4,282,800 - - - - $(-319)
(-6,155)
kWh
-
-
kW-months/year
-
-
MMBtu
$14,133
4,282,800
Tgal
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,029
Cost:
-
$(-52) (-293) - - - - - - $2,426 66,000 $(-345) - $(-52)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,426
66,000
lb
$(-345)
-
$
07: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$112,042
Cost:
$118,598
$(-10,358) (-144,490) - - - - - - - - $122,400 - $(-10,358)
(-144,490)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$122,400
-
$
TOTAL RECOMMENDED Savings:
$136,583
Cost:
$131,164
$(-7,941) (-71,219) $1,621 278 $4,289 774 $14,133 4,282,800 $2,426 66,000 $122,055 - $(-7,941)
(-71,219)
kWh
$1,621
278
kW-months/year
$4,289
774
MMBtu
$14,133
4,282,800
Tgal
$2,426
66,000
lb
$122,055
-
$
TOTAL IMPLEMENTED Savings:
$114,071
Cost:
$118,598
$(-10,410) (-144,783) - - - - - - $2,426 66,000 $122,055 - $(-10,410)
(-144,783)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,426
66,000
lb
$122,055
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes