IAC logo
IAC Assessment: AR0141
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0141
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1998
Principal Product Automotive Accessories and Plating Operation
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 138
Plant Area (Sq.Ft.) 130,000
Annual Production 2,646,000 Pieces
Production Hrs. Annual 2,080
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,593 2,536,342 kWh $0.06
Natural Gas $83,080 18,716 MMBtu $4.44
TOTAL ENERGY COSTS $259,422
RECOMMENDED SAVINGS* $80,931 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,982
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption
$ kWh $ MMBtu $ Tgal $ lb $ $ $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,369
Cost:
$100
$1,369 22,860 - - - - - - - - - - $1,369
22,860
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$463
Cost:
$530
$463 7,620 - - - - - - - - - - $463
7,620
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$613
Cost:
$102
- - $613 138 - - - - - - - - -
-
kWh
$613
138
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$546
Cost:
$240
- - $546 123 - - - - - - - - -
-
kWh
$546
123
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,531
Cost:
$467
- - $1,531 345 - - - - - - - - -
-
kWh
$1,531
345
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,930
Cost:
$8,000
$(-42) (-586) - - - - $5,692 116,000 $(-720) - - - $(-42)
(-586)
kWh
-
-
MMBtu
-
-
Tgal
$5,692
116,000
lb
$(-720)
-
$
-
-
Tgal
07: 3.5131 RECYCLE WHITE WATER Savings:
$5,280
Cost:
$2,075
$(-228) (-3,810) - - $3,060 6,120,000 - - - - $2,448 - $(-228)
(-3,810)
kWh
-
-
MMBtu
$3,060
6,120,000
Tgal
-
-
lb
-
-
$
$2,448
-
Tgal
08: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$50,674
Cost:
$88,000
- - - - - - - - $50,674 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$50,674
-
$
-
-
Tgal
09: 3.2176 INCREASE USE OF AUTOMATION Savings:
$15,525
Cost:
$30,000
- - - - - - - - $15,525 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$15,525
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$80,931
Cost:
$129,514
$1,562 26,084 $2,690 606 $3,060 6,120,000 $5,692 116,000 $65,479 - $2,448 - $1,562
26,084
kWh
$2,690
606
MMBtu
$3,060
6,120,000
Tgal
$5,692
116,000
lb
$65,479
-
$
$2,448
-
Tgal
TOTAL IMPLEMENTED Savings:
$1,982
Cost:
$202
$1,369 22,860 $613 138 - - - - - - - - $1,369
22,860
kWh
$613
138
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $ $ Tgal
Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption Electricity Usage Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Water Consumption