IAC logo
IAC Assessment: AS0228
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0228
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1998
Principal Product Copper Foil
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 200,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,184,363 137,016,415 kWh $0.03
Electricity Demand $1,700,273 212,216 kW-months/year $8.01
Electricity Fees $477,175 - $ -
Natural Gas $90,238 19,141 MMBtu $4.71
TOTAL ENERGY COSTS $6,452,049
RECOMMENDED SAVINGS* $2,277,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $749,867
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$244,239
Cost:
$410,200
$244,239 8,160,317 - - - - - - - - - - - - - - - - $244,239
8,160,317
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$955,252
Cost:
$4,000,000
$2,382,323 78,008,794 $961,439 120,000 $271,675 - $(-2,660,185) (-905,996) - - - - - - - - - - $2,382,323
78,008,794
kWh
$961,439
120,000
kW-months/year
$271,675
-
$
$(-2,660,185)
(-905,996)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
03: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION Savings:
$395,073
Cost:
$1,524,052
$212,577 7,102,579 $182,496 17,010 - - - - - - - - - - - - - - $212,577
7,102,579
kWh
$182,496
17,010
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$17,372
Cost:
$80,000
$17,380 727,433 - - - - - - - - - - - - - - $(-8) - $17,380
727,433
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$(-8)
-
Tgal
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$69,699
Cost:
$225,000
$69,699 2,917,057 - - - - - - - - - - - - - - - - $69,699
2,917,057
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$768
Cost:
$60
- - - - - - - - $768 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$768
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,819
Cost:
$60
- - - - - - - - $16,419 - - - $(-3,600) - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$16,419
-
lb
-
-
$
$(-3,600)
-
$
-
-
$
-
-
Tgal
08: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$65,562
Cost:
$7,000
- - - - - - - - - - - - $65,562 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$65,562
-
$
-
-
$
-
-
Tgal
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$498,755
Cost:
$240
- - - - - - - - - - - - $498,755 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$498,755
-
$
-
-
$
-
-
Tgal
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,873
Cost:
$3,125
- - - - - - - - - - $(-150) - $7,570 - $(-525) - $(-22) - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$(-150)
-
$
$7,570
-
$
$(-525)
-
$
$(-22)
-
Tgal
11: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$11,311
Cost:
$14,500
$232 7,620 $129 11 - - - - - - $10,950 - - - - - - - $232
7,620
kWh
$129
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$10,950
-
$
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$2,277,723
Cost:
$6,264,237
$2,926,450 96,923,800 $1,144,064 137,021 $271,675 - $(-2,660,185) (-905,996) $17,187 - $10,800 - $568,287 - $(-525) - $(-30) - $2,926,450
96,923,800
kWh
$1,144,064
137,021
kW-months/year
$271,675
-
$
$(-2,660,185)
(-905,996)
MMBtu
$17,187
-
lb
$10,800
-
$
$568,287
-
$
$(-525)
-
$
$(-30)
-
Tgal
TOTAL IMPLEMENTED Savings:
$749,867
Cost:
$413,565
$244,239 8,160,317 - - - - - - - - $(-150) - $506,325 - $(-525) - $(-22) - $244,239
8,160,317
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$(-150)
-
$
$506,325
-
$
$(-525)
-
$
$(-22)
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption