IAC logo
IAC Assessment: AS0273
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0273
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2000
Principal Product Vinyl Windows & Doors
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 33
Plant Area (Sq.Ft.) 40,000
Annual Production 18,000 Pieces
Production Hrs. Annual 2,201
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $7,266 110,199 kWh $0.07
Electricity Demand $1,254 508 kW-months/year $2.47
Electricity Fees $939 - $ -
Natural Gas $512 37 MMBtu $13.84
TOTAL ENERGY COSTS $9,971
RECOMMENDED SAVINGS* $20,294 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$948
Cost:
$920
$948 16,706 - - - - - - - - $948
16,706
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,057
Cost:
$120
$675 12,016 $382 65 - - - - - - $675
12,016
kWh
$382
65
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$157
Cost:
$150
$157 2,931 - - - - - - - - $157
2,931
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$470
Cost:
$1,000
$387 6,741 $83 9 - - - - - - $387
6,741
kWh
$83
9
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$3,780
Cost:
$60
- - - - $3,780 - - - - - -
-
kWh
-
-
kW-months/year
$3,780
-
lb
-
-
$
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$3,270
Cost:
$120
- - - - $3,270 - - - - - -
-
kWh
-
-
kW-months/year
$3,270
-
lb
-
-
$
-
-
$
07: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$137
Cost:
$60
- - - - - - $94 - $43 - -
-
kWh
-
-
kW-months/year
-
-
lb
$94
-
$
$43
-
$
08: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$10,475
Cost:
$3,200
- - - - - - $10,475 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,475
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,294
Cost:
$5,630
$2,167 38,394 $465 74 $7,050 - $10,569 - $43 - $2,167
38,394
kWh
$465
74
kW-months/year
$7,050
-
lb
$10,569
-
$
$43
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $