Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2002 |
Principal Product | Manufactures and Installs aluminum windows, dorrs, and tempered glass pr |
NAICS | n/a |
SIC | 3442 - Metal Doors, Sash, And Trim |
Sales | $10,000,000-$50,000,000 |
# of Employees | 174 |
Plant Area (Sq.Ft.) | 71,000 |
Annual Production | 198,000 Pieces |
Production Hrs. Annual | 5,313 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,121 | 920,950 | kWh | $0.08 |
Electricity Demand | $6,971 | 2,403 | kW-months/year | $2.90 |
Electricity Fees | $5,357 | - | $ | - |
TOTAL ENERGY COSTS | $81,449 | |||
RECOMMENDED SAVINGS* | $89,555 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $27,817 Cost: $100 |
$25,447 | 310,174 | $2,370 | 778 | - | - | - | - | - | - | - | - |
$25,447 310,174 kWh |
$2,370 778 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,641 Cost: $1,600 |
$2,125 | 25,901 | $179 | 59 | $(-663) | (-88) | - | - | - | - | - | - |
$2,125 25,901 kWh |
$179 59 kW-months/year |
$(-663) (-88) MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,936 Cost: - |
$1,936 | 23,600 | - | - | - | - | - | - | - | - | - | - |
$1,936 23,600 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $11,799 Cost: $489 |
$164 | 2,000 | $14 | 5 | - | - | $9,082 | - | - | - | $2,539 | - |
$164 2,000 kWh |
$14 5 kW-months/year |
- - MMBtu |
$9,082 - $ |
- - $ |
$2,539 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $23,920 Cost: $582 |
- | - | - | - | - | - | $23,920 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$23,920 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $10,080 Cost: $750 |
- | - | - | - | - | - | $10,080 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,080 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $12,362 Cost: $100 |
- | - | - | - | - | - | - | - | $12,362 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$12,362 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $89,555 Cost: $3,621 |
$29,672 | 361,675 | $2,563 | 842 | $(-663) | (-88) | $43,082 | - | $12,362 | - | $2,539 | - | $29,672 361,675 kWh |
$2,563 842 kW-months/year |
$(-663) (-88) MMBtu |
$43,082 - $ |
$12,362 - $ |
$2,539 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Ancillary Material Cost |