IAC logo
IAC Assessment: AS0326
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0326
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2002
Principal Product Manufactures and Installs aluminum windows, dorrs, and tempered glass pr
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 174
Plant Area (Sq.Ft.) 71,000
Annual Production 198,000 Pieces
Production Hrs. Annual 5,313
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,121 920,950 kWh $0.08
Electricity Demand $6,971 2,403 kW-months/year $2.90
Electricity Fees $5,357 - $ -
TOTAL ENERGY COSTS $81,449
RECOMMENDED SAVINGS* $89,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$27,817
Cost:
$100
$25,447 310,174 $2,370 778 - - - - - - - - $25,447
310,174
kWh
$2,370
778
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,641
Cost:
$1,600
$2,125 25,901 $179 59 $(-663) (-88) - - - - - - $2,125
25,901
kWh
$179
59
kW-months/year
$(-663)
(-88)
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,936
Cost:
-
$1,936 23,600 - - - - - - - - - - $1,936
23,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$11,799
Cost:
$489
$164 2,000 $14 5 - - $9,082 - - - $2,539 - $164
2,000
kWh
$14
5
kW-months/year
-
-
MMBtu
$9,082
-
$
-
-
$
$2,539
-
$
05: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$23,920
Cost:
$582
- - - - - - $23,920 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$23,920
-
$
-
-
$
-
-
$
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$10,080
Cost:
$750
- - - - - - $10,080 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,080
-
$
-
-
$
-
-
$
07: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$12,362
Cost:
$100
- - - - - - - - $12,362 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$12,362
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$89,555
Cost:
$3,621
$29,672 361,675 $2,563 842 $(-663) (-88) $43,082 - $12,362 - $2,539 - $29,672
361,675
kWh
$2,563
842
kW-months/year
$(-663)
(-88)
MMBtu
$43,082
-
$
$12,362
-
$
$2,539
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost