IAC Assessment: AS0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2003
Principal Product Laundry for Uniforms and Work Clothing
NAICS 315210 - Cut and Sew Apparel Contractors
SIC 2326 - Men's and Boys' Work Clothing
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 30,000
Annual Production 7,150,000 Pounds
Production Hrs. Annual 3,654
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,967 594,120 kWh $0.07
Electricity Demand $1,267 2,816 kW-months/year $0.45
Electricity Fees $18,242 - $ -
Natural Gas $84,938 15,562 MMBtu $5.46
TOTAL ENERGY COSTS $169,509
RECOMMENDED SAVINGS* $19,533 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,483
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ %
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$168
Cost:
$350
- - - - $168 31 - - - - -
-
kWh
-
-
kW-months/year
$168
31
MMBtu
-
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,025
Cost:
$30
$1,009 13,121 $16 34 - - - - - - $1,009
13,121
kWh
$16
34
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,305
Cost:
$1,400
$1,287 16,741 $18 72 - - - - - - $1,287
16,741
kWh
$18
72
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$11,899
Cost:
$17,550
$11,664 151,699 $235 498 - - - - - - $11,664
151,699
kWh
$235
498
kW-months/year
-
-
MMBtu
-
-
$
-
-
%
05: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$2,290
Cost:
$482
- - - - - - $2,290 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,290
-
$
-
-
%
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,846
Cost:
$1,000
- - - - - - - - $2,846 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,846
-
%
TOTAL RECOMMENDED Savings:
$19,533
Cost:
$20,812
$13,960 181,561 $269 604 $168 31 $2,290 - $2,846 - $13,960
181,561
kWh
$269
604
kW-months/year
$168
31
MMBtu
$2,290
-
$
$2,846
-
%
TOTAL IMPLEMENTED Savings:
$3,483
Cost:
$862
$1,009 13,121 $16 34 $168 31 $2,290 - - - $1,009
13,121
kWh
$16
34
kW-months/year
$168
31
MMBtu
$2,290
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ %
Electricity Usage Electricity Demand Natural Gas Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Administrative Changes Increase in Production