Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2004 |
Principal Product | Aluminum sows |
NAICS | 331314 - Secondary Smelting and Alloying of Aluminum |
SIC | 3341 - Secondary Nonferrous Metals |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 1,000,000 |
Annual Production | 139,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $247,039 | 4,031,304 | kWh | $0.06 |
Electricity Demand | $12,984 | 8,323 | kW-months/year | $1.56 |
Electricity Fees | $19,120 | - | $ | - |
Natural Gas | $836,445 | 101,147 | MMBtu | $8.27 |
TOTAL ENERGY COSTS | $1,115,588 | |||
RECOMMENDED SAVINGS* | $279,448 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $21,304 Cost: $10,000 |
- | - | - | - | $21,304 | 6,087 | - | - | - | - |
- - kWh |
- - kW-months/year |
$21,304 6,087 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $151,757 Cost: $37,000 |
$(-6,572) | (-149,370) | $(-1,541) | (-205) | - | - | $65,700 | 7,118 | $94,170 | - |
$(-6,572) (-149,370) kWh |
$(-1,541) (-205) kW-months/year |
- - MMBtu |
$65,700 7,118 MMBtu |
$94,170 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $59,563 Cost: $24,322 |
$48,251 | 1,096,612 | $11,312 | 1,500 | - | - | - | - | - | - |
$48,251 1,096,612 kWh |
$11,312 1,500 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE |
Savings: $42,444 Cost: $17,685 |
$(-1,734) | (-39,420) | $(-407) | (-54) | $44,585 | 5,650 | - | - | - | - |
$(-1,734) (-39,420) kWh |
$(-407) (-54) kW-months/year |
$44,585 5,650 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $719 Cost: $506 |
$719 | 16,377 | - | - | - | - | - | - | - | - |
$719 16,377 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $383 Cost: $30 |
$310 | 7,058 | $73 | 10 | - | - | - | - | - | - |
$310 7,058 kWh |
$73 10 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,939 Cost: $60 |
$2,382 | 54,147 | $557 | 74 | - | - | - | - | - | - |
$2,382 54,147 kWh |
$557 74 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $339 Cost: $150 |
- | - | - | - | $339 | 52 | - | - | - | - |
- - kWh |
- - kW-months/year |
$339 52 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $279,448 Cost: $89,753 |
$43,356 | 985,404 | $9,994 | 1,325 | $66,228 | 11,789 | $65,700 | 7,118 | $94,170 | - | $43,356 985,404 kWh |
$9,994 1,325 kW-months/year |
$66,228 11,789 MMBtu |
$65,700 7,118 MMBtu |
$94,170 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Personnel Changes |