Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2005 |
Principal Product | Aircraft evacuation slides and rafts |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 465 |
Plant Area (Sq.Ft.) | 283,000 |
Annual Production | 1,900 Pieces |
Production Hrs. Annual | 2,510 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $258,925 | 4,384,680 | kWh | $0.06 |
Electricity Demand | $28,331 | 11,074 | kW-months/year | $2.56 |
Electricity Fees | $22,098 | - | $ | - |
Natural Gas | $76,000 | 9,488 | MMBtu | $8.01 |
TOTAL ENERGY COSTS | $385,354 | |||
RECOMMENDED SAVINGS* | $18,702 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,874 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $5,134 Cost: $10,000 |
$4,718 | 79,901 | $416 | 14 | - | - |
$4,718 79,901 kWh |
$416 14 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,439 Cost: $1,000 |
$3,173 | 53,740 | $266 | 9 | - | - |
$3,173 53,740 kWh |
$266 9 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $429 Cost: $1,950 |
$429 | 8,328 | - | - | - | - |
$429 8,328 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $872 Cost: $800 |
$722 | 12,323 | $150 | 5 | - | - |
$722 12,323 kWh |
$150 5 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $1,228 Cost: $1,100 |
$1,228 | 18,921 | - | - | - | - |
$1,228 18,921 kWh |
- - kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL |
Savings: $7,600 Cost: $380 |
- | - | - | - | $7,600 | 9,600 |
- - kWh |
- - kW-months/year |
$7,600 9,600 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $18,702 Cost: $15,230 |
$10,270 | 173,213 | $832 | 28 | $7,600 | 9,600 | $10,270 173,213 kWh |
$832 28 kW-months/year |
$7,600 9,600 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,874 Cost: $13,750 |
$9,042 | 154,292 | $832 | 28 | - | - | $9,042 154,292 kWh |
$832 28 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||