Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2005 |
Principal Product | Injectable drugs |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 280,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,320 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $932,181 | 15,062,245 | kWh | $0.06 |
Natural Gas | $205,698 | 3,489 | MMBtu | $58.96 |
TOTAL ENERGY COSTS | $1,257,879 | |||
RECOMMENDED SAVINGS* | $100,919 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,383 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $56,988 Cost: $21,600 |
$46,206 | 689,644 | $10,782 | 3,979 | - | - |
$46,206 689,644 kWh |
$10,782 3,979 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $18,100 Cost: $1,500 |
- | - | - | - | $18,100 | 307 |
- - kWh |
- - kW-months/year |
$18,100 307 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,306 Cost: $1,000 |
$6,405 | 95,494 | $901 | 28 | - | - |
$6,405 95,494 kWh |
$901 28 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $6,515 Cost: $10,000 |
$5,710 | 85,230 | $805 | 24 | - | - |
$5,710 85,230 kWh |
$805 24 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $5,783 Cost: $11,000 |
$5,068 | 75,646 | $715 | 22 | - | - |
$5,068 75,646 kWh |
$715 22 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $4,077 Cost: $8,000 |
$3,632 | 54,210 | $445 | 14 | - | - |
$3,632 54,210 kWh |
$445 14 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,150 Cost: $991 |
- | - | - | - | $2,150 | 36 |
- - kWh |
- - kW-months/year |
$2,150 36 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $100,919 Cost: $54,091 |
$67,021 | 1,000,224 | $13,648 | 4,067 | $20,250 | 343 | $67,021 1,000,224 kWh |
$13,648 4,067 kW-months/year |
$20,250 343 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,383 Cost: $9,000 |
$10,037 | 149,704 | $1,346 | 42 | - | - | $10,037 149,704 kWh |
$1,346 42 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |