IAC logo
IAC Assessment: AS0423
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0423
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2006
Principal Product golf clubs
NAICS 332439 - Other Metal Container Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 770
Plant Area (Sq.Ft.) 2,178,000
Annual Production 130,000 Pieces
Production Hrs. Annual 4,318
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $845,308 11,168,169 kWh $0.08
Electricity Demand $41,515 25,845 kW-months/year $1.61
Natural Gas $51,437 4,624 MMBtu $11.12
TOTAL ENERGY COSTS $938,260
RECOMMENDED SAVINGS* $267,968 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production
$ kWh $ kW-months/year $ $
01: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$205,767
Cost:
$2,100,000
- - - - $205,767 - -
-
kWh
-
-
kW-months/year
$205,767
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,786
Cost:
$1,000
$13,786 171,790 - - - - $13,786
171,790
kWh
-
-
kW-months/year
-
-
$
03: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$13,786
Cost:
$13,000
$13,002 171,750 $784 40 - - $13,002
171,750
kWh
$784
40
kW-months/year
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$13,316
Cost:
$10,000
$12,559 165,909 $757 39 - - $12,559
165,909
kWh
$757
39
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,912
Cost:
$10,000
$12,178 160,870 $734 38 - - $12,178
160,870
kWh
$734
38
kW-months/year
-
-
$
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$8,401
Cost:
$16,000
$7,923 104,658 $478 24 - - $7,923
104,658
kWh
$478
24
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$267,968
Cost:
$2,150,000
$59,448 774,977 $2,753 141 $205,767 - $59,448
774,977
kWh
$2,753
141
kW-months/year
$205,767
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand By-product Production Electricity Usage Electricity Demand By-product Production