IAC Assessment: AS0476
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0476
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2019
Principal Product Rocket Propulsion Testing
NAICS 336415 - Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing
SIC 3764 - Space Propulsion Units And Parts
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 1,001 Units
Production Hrs. Annual 2,080
Location (State) NM
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $675,995 15,879,651 kWh $0.04
Electricity Demand $698,397 35,104 kW-months/year $19.90
Electricity Fees $93,102 - $ -
Fuel Oil #2 $1,800,000 81,828 MMBtu $22.00
TOTAL ENERGY COSTS $3,267,494
RECOMMENDED SAVINGS* $1,383,717 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$924,031
Cost:
$7,925,140
$701,629 16,316,945 $222,402 11,176 - - - - $701,629
16,316,945
kWh
$222,402
11,176
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$379,615
Cost:
$78,024
$(-217,699) (-5,062,765) $(-276,013) (-13,870) $873,327 39,701 - - $(-217,699)
(-5,062,765)
kWh
$(-276,013)
(-13,870)
kW-months/year
$873,327
39,701
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$65,373
Cost:
$17,381
- - - - - - $65,373 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$65,373
-
$
04: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$14,698
Cost:
$7,484
$(-191) (-4,577) $(-3,801) (-196) $18,690 850 - - $(-191)
(-4,577)
kWh
$(-3,801)
(-196)
kW-months/year
$18,690
850
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,383,717
Cost:
$8,028,029
$483,739 11,249,603 $(-57,412) (-2,890) $892,017 40,551 $65,373 - $483,739
11,249,603
kWh
$(-57,412)
(-2,890)
kW-months/year
$892,017
40,551
MMBtu
$65,373
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 One-time Revenue or Avoided Cost