Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2022 |
Principal Product | Higher Education |
NAICS | 611310 - Colleges, Universities, and Professional Schools |
SIC | 8221 - Colleges And Universities |
Sales | $1,000,000-$5,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 100,792 |
Annual Production | 1 Units |
Production Hrs. Annual | 2,000 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $79,650 | 1,090,800 | kWh | $0.07 |
Electricity Demand | $23,992 | 2,999 | kW-months/year | $8.00 |
Electricity Fees | $20,040 | - | $ | - |
Natural Gas | $25,935 | 2,799 | MMBtu | $9.27 |
Other Energy | $5,399 | 1 | MMBtu | $5,399.00 |
TOTAL ENERGY COSTS | $155,016 | |||
RECOMMENDED SAVINGS* | $25,416 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $9,232 Cost: $27,889 |
$7,810 | 106,990 | - | - | $1,422 | 153 | - | - |
$7,810 106,990 kWh |
- - kW-months/year |
$1,422 153 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $8,295 Cost: $7,150 |
$842 | 11,541 | - | - | $7,453 | 804 | - | - |
$842 11,541 kWh |
- - kW-months/year |
$7,453 804 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING |
Savings: $3,091 Cost: $5,725 |
$2,467 | 33,799 | $624 | 78 | - | - | - | - |
$2,467 33,799 kWh |
$624 78 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,850 Cost: $2,800 |
$1,274 | 17,454 | $576 | 72 | - | - | - | - |
$1,274 17,454 kWh |
$576 72 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $924 Cost: $460 |
- | - | - | - | $1,224 | 132 | $(-300) | - |
- - kWh |
- - kW-months/year |
$1,224 132 MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT |
Savings: $918 Cost: $105 |
- | - | - | - | $918 | 99 | - | - |
- - kWh |
- - kW-months/year |
$918 99 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $894 Cost: $700 |
$806 | 11,030 | $88 | 11 | - | - | - | - |
$806 11,030 kWh |
$88 11 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $212 Cost: $845 |
$140 | 1,916 | $72 | 9 | - | - | - | - |
$140 1,916 kWh |
$72 9 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,416 Cost: $45,674 |
$13,339 | 182,730 | $1,360 | 170 | $11,017 | 1,188 | $(-300) | - | $13,339 182,730 kWh |
$1,360 170 kW-months/year |
$11,017 1,188 MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |