IAC logo
IAC Assessment: AS0553
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0553
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product diving boards, swimming pool slides
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 72,000
Annual Production 45,000 Units
Production Hrs. Annual 2,130
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,670 927,944 kWh $0.11
Electricity Demand $27,106 4,092 kW-months/year $6.62
Electricity Fees $33,260 - $ -
Natural Gas $15,808 1,140 MMBtu $13.87
LPG $8,804 255 MMBtu $34.58
TOTAL ENERGY COSTS $191,648
RECOMMENDED SAVINGS* $147,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$105,557
Cost:
$933,296
$102,282 878,451 $3,275 493 - - - - $102,282
878,451
kWh
$3,275
493
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,790
Cost:
$7,380
$16,667 141,910 $3,123 456 - - - - $16,667
141,910
kWh
$3,123
456
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$10,629
Cost:
$77,000
$(-5,175) (-43,126) - - $8,804 255 $7,000 - $(-5,175)
(-43,126)
kWh
-
-
kW-months/year
$8,804
255
MMBtu
$7,000
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,052
Cost:
$3,786
$7,902 69,194 $2,150 313 - - - - $7,902
69,194
kWh
$2,150
313
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$708
Cost:
$612
$708 5,886 - - - - - - $708
5,886
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$345
Cost:
$575
$310 2,684 $35 5 - - - - $310
2,684
kWh
$35
5
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$147,081
Cost:
$1,022,649
$122,694 1,054,999 $8,583 1,267 $8,804 255 $7,000 - $122,694
1,054,999
kWh
$8,583
1,267
kW-months/year
$8,804
255
MMBtu
$7,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost