Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Arizona State University |
---|---|
Assessment Year | 2023 |
Principal Product | concrete construction blocks |
NAICS | 327331 - Concrete Block and Brick Manufacturing |
SIC | 3271 - Concrete Block And Brick |
Sales | $5,000,000-$10,000,000 |
# of Employees | 24 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 5,000,000 Units |
Production Hrs. Annual | 3,094 |
Location (State) | AZ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $30,794 | 588,050 | kWh | $0.05 |
Electricity Demand | $47,982 | 2,602 | kW-months/year | $18.44 |
Electricity Fees | $32,780 | - | $ | - |
Fuel Oil #1 | $73,562 | 2,195 | MMBtu | $33.51 |
TOTAL ENERGY COSTS | $185,118 | |||
RECOMMENDED SAVINGS* | $48,232 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #1 | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Fuel Oil #1 | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $29,191 Cost: $11,546 |
$19,750 | 377,132 | $9,441 | 512 | - | - | - | - | - | - |
$19,750 377,132 kWh |
$9,441 512 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE |
Savings: $10,191 Cost: $10,364 |
- | - | - | - | $10,191 | 304 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,191 304 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $3,260 Cost: $2,932 |
- | - | - | - | - | - | - | - | $3,260 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$3,260 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $2,107 Cost: $1,243 |
$523 | 9,977 | $922 | 50 | - | - | - | - | $662 | - |
$523 9,977 kWh |
$922 50 kW-months/year |
- - MMBtu |
- - $ |
$662 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,534 Cost: $2,105 |
- | - | - | - | - | - | $1,534 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,534 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,078 Cost: $399 |
$469 | 8,956 | $609 | 33 | - | - | - | - | - | - |
$469 8,956 kWh |
$609 33 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $871 Cost: $21 |
$456 | 8,712 | $415 | 23 | - | - | - | - | - | - |
$456 8,712 kWh |
$415 23 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $48,232 Cost: $28,610 |
$21,198 | 404,777 | $11,387 | 618 | $10,191 | 304 | $1,534 | - | $3,922 | - | $21,198 404,777 kWh |
$11,387 618 kW-months/year |
$10,191 304 MMBtu |
$1,534 - $ |
$3,922 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #1 | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Fuel Oil #1 | Ancillary Material Cost | Primary Product |