IAC logo
IAC Assessment: AS0567
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0567
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2023
Principal Product bottled and canned drinks
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 600,000
Annual Production 40,000,000 Units
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,148,336 16,238,303 kWh $0.07
Electricity Demand $264,111 35,323 kW-months/year $7.48
Electricity Fees $32,909 - $ -
Natural Gas $315,616 27,229 MMBtu $11.59
TOTAL ENERGY COSTS $1,760,972
RECOMMENDED SAVINGS* $253,260 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $100,430
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$100,430
Cost:
$774,239
$81,551 1,153,477 $18,879 2,525 $81,551
1,153,477
kWh
$18,879
2,525
kW-months/year
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$86,125
Cost:
$165,996
$86,125 1,219,448 - - $86,125
1,219,448
kWh
-
-
kW-months/year
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$57,803
Cost:
$10,720
$50,299 711,450 $7,504 1,003 $50,299
711,450
kWh
$7,504
1,003
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,255
Cost:
$31,926
$6,468 91,489 $1,787 239 $6,468
91,489
kWh
$1,787
239
kW-months/year
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$647
Cost:
$384
$557 7,884 $90 12 $557
7,884
kWh
$90
12
kW-months/year
TOTAL RECOMMENDED Savings:
$253,260
Cost:
$983,265
$225,000 3,183,748 $28,260 3,779 $225,000
3,183,748
kWh
$28,260
3,779
kW-months/year
TOTAL IMPLEMENTED Savings:
$100,430
Cost:
$774,239
$81,551 1,153,477 $18,879 2,525 $81,551
1,153,477
kWh
$18,879
2,525
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand