Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2024
Principal Product Medical Services
NAICS 622110 - General Medical and Surgical Hospitals
SIC 8062 - General Medical & Surgical Hospitals
Sales $1,000,000-$5,000,000
# of Employees 6,700
Plant Area (Sq.Ft.) 100,000
Annual Production 1 Units
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,228,458 38,043,420 kWh $0.06
Electricity Demand $1,307,515 92,419 kW-months/year $14.15
Electricity Fees $202,848 - $ -
Natural Gas $400,652 61,753 MMBtu $6.49
TOTAL ENERGY COSTS $4,139,473
RECOMMENDED SAVINGS* $337,682 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$218,122
Cost:
$1,758,568
$204,745 3,542,306 $47,577 3,351 - - $(-34,200) - $204,745
3,542,306
kWh
$47,577
3,351
kW-months/year
-
-
MMBtu
$(-34,200)
-
$
02: 2.1224 REPLACE BOILER Savings:
$56,229
Cost:
$300,000
- - - - $56,229 8,664 - - -
-
kWh
-
-
kW-months/year
$56,229
8,664
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$50,126
Cost:
$154,154
$26,781 463,334 $23,345 1,664 - - - - $26,781
463,334
kWh
$23,345
1,664
kW-months/year
-
-
MMBtu
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$11,158
Cost:
$14,100
$11,158 109,715 - - - - - - $11,158
109,715
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,756
Cost:
$1,363
$1,756 17,259 - - - - - - $1,756
17,259
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$291
Cost:
$140
$264 2,595 $27 2 - - - - $264
2,595
kWh
$27
2
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$337,682
Cost:
$2,228,325
$244,704 4,135,209 $70,949 5,017 $56,229 8,664 $(-34,200) - $244,704
4,135,209
kWh
$70,949
5,017
kW-months/year
$56,229
8,664
MMBtu
$(-34,200)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost