IAC logo
IAC Assessment: AS0603
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0603
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2025
Principal Product Investment casting for industrial and aerospace applications
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 108,000
Annual Production 30,000 Units
Production Hrs. Annual 6,024
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $461,422 4,363,680 kWh $0.11
Electricity Demand $73,118 14,622 kW-months/year $5.00
Electricity Fees $33,969 - $ -
Natural Gas $84,535 7,092 MMBtu $11.92
Other Energy $34,860 1 MMBtu $34,860.00
TOTAL ENERGY COSTS $687,904
RECOMMENDED SAVINGS* $793,666 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$320,000
Cost:
$104,670
- - - - - - $320,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$320,000
-
$
02: 3.3127 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS Savings:
$279,654
Cost:
$313,240
- - - - - - $279,654 - -
-
kWh
-
-
kW-months/year
-
-
$
$279,654
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$172,434
Cost:
$1,040,663
$176,851 1,673,138 $11,657 2,331 $(-16,074) - - - $176,851
1,673,138
kWh
$11,657
2,331
kW-months/year
$(-16,074)
-
$
-
-
$
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$18,772
Cost:
$291
- - - - - - $18,772 - -
-
kWh
-
-
kW-months/year
-
-
$
$18,772
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,172
Cost:
$545
$654 6,184 $518 104 - - - - $654
6,184
kWh
$518
104
kW-months/year
-
-
$
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,156
Cost:
$949
$1,156 10,934 - - - - - - $1,156
10,934
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$478
Cost:
$246
$437 4,133 $41 8 - - - - $437
4,133
kWh
$41
8
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$793,666
Cost:
$1,460,604
$179,098 1,694,389 $12,216 2,443 $(-16,074) - $618,426 - $179,098
1,694,389
kWh
$12,216
2,443
kW-months/year
$(-16,074)
-
$
$618,426
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Ancillary Material Cost One-time Revenue or Avoided Cost