IAC Assessment: AT0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1989
Principal Product HOSIERY & SOCKS
NAICS n/a
SIC 2252 - Hosiery, Nec
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 0
Annual Production 120,000 Pieces
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,553 3,475,381 kWh $0.06
Natural Gas $12,600 3,219 MMBtu $3.91
Fuel Oil #2 $41,553 11,875 MMBtu $3.50
TOTAL ENERGY COSTS $247,706
RECOMMENDED SAVINGS* $22,114 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,480
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,653
Cost:
$2,068
$2,653 47,773 - - - - - - $2,653
47,773
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,019
Cost:
-
$3,019 54,220 - - - - - - $3,019
54,220
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$821
Cost:
-
$821 14,654 - - - - - - $821
14,654
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,359
Cost:
$100
$1,359 24,326 - - - - - - $1,359
24,326
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$127
Cost:
$300
$127 2,345 - - - - - - $127
2,345
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$605
Cost:
$600
$605 10,844 - - - - - - $605
10,844
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,794
Cost:
$10,000
- - $1,345 344 $4,449 1,271 - - -
-
kWh
$1,345
344
MMBtu
$4,449
1,271
MMBtu
-
-
$
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,036
Cost:
$50
- - $1,169 299 $3,867 1,105 - - -
-
kWh
$1,169
299
MMBtu
$3,867
1,105
MMBtu
-
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,700
Cost:
-
- - $673 172 $2,227 636 $(-200) - -
-
kWh
$673
172
MMBtu
$2,227
636
MMBtu
$(-200)
-
$
TOTAL RECOMMENDED Savings:
$22,114
Cost:
$13,118
$8,584 154,162 $3,187 815 $10,543 3,012 $(-200) - $8,584
154,162
kWh
$3,187
815
MMBtu
$10,543
3,012
MMBtu
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$12,480
Cost:
$3,118
$4,744 85,288 $1,842 471 $6,094 1,741 $(-200) - $4,744
85,288
kWh
$1,842
471
MMBtu
$6,094
1,741
MMBtu
$(-200)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes