IAC logo
IAC Assessment: BS0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2012
Principal Product Dimensional Lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 259,705
Annual Production 350,000 Thousand Feet
Production Hrs. Annual 4,300
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $739,458 25,641,864 kWh $0.03
Electricity Demand $51,531 56,683 kW-months/year $0.91
Electricity Fees $261,483 - $ -
Wood $924,788 1,004,063 MMBtu $0.92
TOTAL ENERGY COSTS $1,977,259
RECOMMENDED SAVINGS* $39,226 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,318
#|Description Savings
Cost
Status Electricity Usage Wood Electricity Usage Wood
$ kWh $ MMBtu
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$265
Cost:
$555
$265 9,039 - - $265
9,039
kWh
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,970
Cost:
$609
$6,970 243,278 - - $6,970
243,278
kWh
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,733
Cost:
$178
$2,733 95,386 - - $2,733
95,386
kWh
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,615
Cost:
$10,000
- - $15,615 16,954 -
-
kWh
$15,615
16,954
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,653
Cost:
$7,846
- - $1,653 1,796 -
-
kWh
$1,653
1,796
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,990
Cost:
$17,000
- - $11,990 13,022 -
-
kWh
$11,990
13,022
MMBtu
TOTAL RECOMMENDED Savings:
$39,226
Cost:
$36,188
$9,968 347,703 $29,258 31,772 $9,968
347,703
kWh
$29,258
31,772
MMBtu
TOTAL IMPLEMENTED Savings:
$25,318
Cost:
$10,787
$9,703 338,664 $15,615 16,954 $9,703
338,664
kWh
$15,615
16,954
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Wood Electricity Usage Wood