IAC Assessment: BS0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2013
Principal Product Cast and Ductile Iron
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $500,000-$1,000,000
# of Employees 10
Plant Area (Sq.Ft.) 25,300
Annual Production 972 Tons
Production Hrs. Annual 3,060
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,549 337,040 kWh $0.06
Electricity Demand $23,390 4,640 kW-months/year $5.04
Other Gas $12,000 357 MMBtu $33.62
TOTAL ENERGY COSTS $57,822
RECOMMENDED SAVINGS* $4,366 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,668
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$339
Cost:
$120
$90 1,497 $249 50 - - - - $90
1,497
kWh
$249
50
kW-months/year
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$478
Cost:
$15
$363 5,957 $115 23 - - - - $363
5,957
kWh
$115
23
kW-months/year
-
-
lb
-
-
$
03: 3.1114 REUSE HIGH FERROUS METAL DUST AS RAW MATERIAL Savings:
$1,699
Cost:
$1,382
$(-2) (-36) - - $1,883 6,885 $(-182) - $(-2)
(-36)
kWh
-
-
kW-months/year
$1,883
6,885
lb
$(-182)
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,850
Cost:
$752
$1,850 30,322 - - - - - - $1,850
30,322
kWh
-
-
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$4,366
Cost:
$2,269
$2,301 37,740 $365 73 $1,883 6,885 $(-182) - $2,301
37,740
kWh
$365
73
kW-months/year
$1,883
6,885
lb
$(-182)
-
$
TOTAL IMPLEMENTED Savings:
$2,668
Cost:
$887
$2,303 37,776 $365 73 - - - - $2,303
37,776
kWh
$365
73
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes