Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Boise State University |
---|---|
Assessment Year | 2013 |
Principal Product | Cast and Ductile Iron |
NAICS | 331511 - Iron Foundries |
SIC | 3321 - Gray And Ductile Iron Foundries |
Sales | $500,000-$1,000,000 |
# of Employees | 10 |
Plant Area (Sq.Ft.) | 25,300 |
Annual Production | 972 Tons |
Production Hrs. Annual | 3,060 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $20,549 | 337,040 | kWh | $0.06 |
Electricity Demand | $23,390 | 4,640 | kW-months/year | $5.04 |
Other Gas | $12,000 | 357 | MMBtu | $33.62 |
TOTAL ENERGY COSTS | $57,822 | |||
RECOMMENDED SAVINGS* | $4,366 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,668 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $339 Cost: $120 |
$90 | 1,497 | $249 | 50 | - | - | - | - |
$90 1,497 kWh |
$249 50 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $478 Cost: $15 |
$363 | 5,957 | $115 | 23 | - | - | - | - |
$363 5,957 kWh |
$115 23 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1114 REUSE HIGH FERROUS METAL DUST AS RAW MATERIAL |
Savings: $1,699 Cost: $1,382 |
$(-2) | (-36) | - | - | $1,883 | 6,885 | $(-182) | - |
$(-2) (-36) kWh |
- - kW-months/year |
$1,883 6,885 lb |
$(-182) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,850 Cost: $752 |
$1,850 | 30,322 | - | - | - | - | - | - |
$1,850 30,322 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $4,366 Cost: $2,269 |
$2,301 | 37,740 | $365 | 73 | $1,883 | 6,885 | $(-182) | - | $2,301 37,740 kWh |
$365 73 kW-months/year |
$1,883 6,885 lb |
$(-182) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,668 Cost: $887 |
$2,303 | 37,776 | $365 | 73 | - | - | - | - | $2,303 37,776 kWh |
$365 73 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||