IAC logo
IAC Assessment: BS0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2014
Principal Product Aluminum Castings
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3365 - Aluminum Foundries
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 37,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 4,824
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,623 1,327,080 kWh $0.06
Electricity Demand $28,452 5,871 kW-months/year $4.85
Natural Gas $25,876 3,634 MMBtu $7.12
TOTAL ENERGY COSTS $137,951
RECOMMENDED SAVINGS* $10,981 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,316
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$174
Cost:
$977
$174 2,764 - - - - $174
2,764
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$300
Cost:
$15
$252 3,998 $48 10 - - $252
3,998
kWh
$48
10
kW-months/year
-
-
MMBtu
03: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$3,665
Cost:
$2,000
$3,665 58,169 - - - - $3,665
58,169
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,239
Cost:
$650
$6,239 94,044 - - - - $6,239
94,044
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$361
Cost:
$467
- - - - $361 51 -
-
kWh
-
-
kW-months/year
$361
51
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$242
Cost:
$660
$242 3,855 - - - - $242
3,855
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,981
Cost:
$4,769
$10,572 162,830 $48 10 $361 51 $10,572
162,830
kWh
$48
10
kW-months/year
$361
51
MMBtu
TOTAL IMPLEMENTED Savings:
$7,316
Cost:
$2,769
$6,907 104,661 $48 10 $361 51 $6,907
104,661
kWh
$48
10
kW-months/year
$361
51
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas