IAC Assessment: BS0056
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0056
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Doors
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 340
Plant Area (Sq.Ft.) 243,000
Annual Production 416,000 Pieces
Production Hrs. Annual 2,080
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $414,254 8,148,922 kWh $0.05
Electricity Demand $141,231 21,053 kW-months/year $6.71
Electricity Fees $3,497 - $ -
Natural Gas $91,383 12,461 MMBtu $7.33
TOTAL ENERGY COSTS $650,365
RECOMMENDED SAVINGS* $49,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$656
Cost:
$3,871
$483 9,500 $173 26 - - - - $483
9,500
kWh
$173
26
kW-months/year
-
-
MMBtu
-
-
$
02: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$2,499
Cost:
$3,000
- - - - - - $2,499 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,499
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$188
Cost:
$91
$188 3,693 - - - - - - $188
3,693
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$652
Cost:
$2,825
$652 12,813 - - - - - - $652
12,813
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$10,964
Cost:
$2,208
$8,496 167,104 $2,469 368 - - - - $8,496
167,104
kWh
$2,469
368
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,643
Cost:
$1,314
$1,180 23,206 $463 69 - - - - $1,180
23,206
kWh
$463
69
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$71
Cost:
$711
$71 1,375 - - - - - - $71
1,375
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,405
Cost:
$3,714
$4,135 81,334 $2,270 338 - - - - $4,135
81,334
kWh
$2,270
338
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,322
Cost:
$4,102
- - - - $5,322 728 - - -
-
kWh
-
-
kW-months/year
$5,322
728
MMBtu
-
-
$
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$11,761
Cost:
$5,132
- - - - $11,761 1,609 - - -
-
kWh
-
-
kW-months/year
$11,761
1,609
MMBtu
-
-
$
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,102
Cost:
$145
$9,102 179,040 - - - - - - $9,102
179,040
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$49,263
Cost:
$27,113
$24,307 478,065 $5,375 801 $17,083 2,337 $2,499 - $24,307
478,065
kWh
$5,375
801
kW-months/year
$17,083
2,337
MMBtu
$2,499
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes