IAC logo
IAC Assessment: BS0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Water Filters
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 144
Plant Area (Sq.Ft.) 50,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,887 2,897,181 kWh $0.05
Electricity Demand $62,309 9,648 kW-months/year $6.46
Electricity Fees $13,654 - $ -
Natural Gas $34,017 4,599 MMBtu $7.40
TOTAL ENERGY COSTS $252,867
RECOMMENDED SAVINGS* $44,248 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,401
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,761
Cost:
$18,045
- - - - $12,761 - -
-
kWh
-
-
kW-months/year
$12,761
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,532
Cost:
$1,105
$3,691 74,844 $1,841 285 - - $3,691
74,844
kWh
$1,841
285
kW-months/year
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,254
Cost:
$526
$918 18,611 $336 52 - - $918
18,611
kWh
$336
52
kW-months/year
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$744
Cost:
$264
$424 8,587 $320 50 - - $424
8,587
kWh
$320
50
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,386
Cost:
$9,729
$15,553 315,339 $7,833 1,213 - - $15,553
315,339
kWh
$7,833
1,213
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$178
Cost:
$91
$178 3,602 - - - - $178
3,602
kWh
-
-
kW-months/year
-
-
$
07: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$368
Cost:
$4,065
$368 7,464 - - - - $368
7,464
kWh
-
-
kW-months/year
-
-
$
08: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$25
Cost:
$929
$25 503 - - - - $25
503
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$44,248
Cost:
$34,754
$21,157 428,950 $10,330 1,600 $12,761 - $21,157
428,950
kWh
$10,330
1,600
kW-months/year
$12,761
-
$
TOTAL IMPLEMENTED Savings:
$37,401
Cost:
$28,300
$16,471 333,950 $8,169 1,265 $12,761 - $16,471
333,950
kWh
$8,169
1,265
kW-months/year
$12,761
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees