IAC logo
IAC Assessment: BS0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2015
Principal Product Semiconductor Manufacturing Equipment
NAICS 333242 - Semiconductor Machinery Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 27,744
Annual Production 40,000 Pieces
Production Hrs. Annual 4,000
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,817 3,460,045 kWh $0.05
Electricity Demand $66,510 10,929 kW-months/year $6.09
Electricity Fees $9,490 - $ -
Natural Gas $53,854 7,296 MMBtu $7.38
TOTAL ENERGY COSTS $304,671
RECOMMENDED SAVINGS* $40,571 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$10,458
Cost:
$568
$10,458 207,000 - - - - - - - - - - - - $10,458
207,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,531
Cost:
$26
$357 7,064 - - - - $1,174 161 - - - - - - $357
7,064
kWh
-
-
kW-months/year
-
-
$
$1,174
161
MMBtu
-
-
$
-
-
$
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,219
Cost:
$907
$1,219 24,137 - - - - - - - - - - - - $1,219
24,137
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,249
Cost:
$80
- - - - - - - - $1,249 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,249
-
$
-
-
$
-
-
Tgal
05: 2.8112 COMBINE UTILITY METERS Savings:
$258
Cost:
$253
- - - - $258 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$258
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
06: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$13,061
Cost:
$19,065
$(-208) (-4,125) $(-241) (-40) - - - - - - $13,510 - - - $(-208)
(-4,125)
kWh
$(-241)
(-40)
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$13,510
-
$
-
-
Tgal
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,093
Cost:
$25,245
- - - - $12,093 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$12,093
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
08: 3.4151 MINIMIZE WATER USAGE Savings:
$702
Cost:
$5,938
- - - - - - - - - - - - $702 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
$702
-
Tgal
TOTAL RECOMMENDED Savings:
$40,571
Cost:
$52,082
$11,826 234,076 $(-241) (-40) $12,351 - $1,174 161 $1,249 - $13,510 - $702 - $11,826
234,076
kWh
$(-241)
(-40)
kW-months/year
$12,351
-
$
$1,174
161
MMBtu
$1,249
-
$
$13,510
-
$
$702
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Ancillary Material Cost Water Consumption