IAC logo
IAC Assessment: BS0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Combine Leveling Systems
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 22,500
Annual Production 100 Units
Production Hrs. Annual 2,080
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,743 263,920 kWh $0.06
Electricity Demand $8,989 1,498 kW-months/year $6.00
LPG $9,708 556 MMBtu $17.46
TOTAL ENERGY COSTS $37,040
RECOMMENDED SAVINGS* $2,791 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,419
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,181
Cost:
$2,633
$80 1,268 $1,101 184 - - $80
1,268
kWh
$1,101
184
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$124
Cost:
$187
$124 1,975 - - - - $124
1,975
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$349
Cost:
$660
$349 5,550 - - - - $349
5,550
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$765
Cost:
$2,575
$765 12,151 - - - - $765
12,151
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$372
Cost:
$384
- - - - $372 21 -
-
kWh
-
-
kW-months/year
$372
21
MMBtu
TOTAL RECOMMENDED Savings:
$2,791
Cost:
$6,439
$1,318 20,944 $1,101 184 $372 21 $1,318
20,944
kWh
$1,101
184
kW-months/year
$372
21
MMBtu
TOTAL IMPLEMENTED Savings:
$2,419
Cost:
$6,055
$1,318 20,944 $1,101 184 - - $1,318
20,944
kWh
$1,101
184
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG