IAC logo
IAC Assessment: BS0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Coring Bits and Reamers
NAICS 333131 - Mining Machinery and Equipment Manufacturing
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 46
Plant Area (Sq.Ft.) 50,000
Annual Production 40,000 Pieces
Production Hrs. Annual 2,000
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,331 1,788,320 kWh $0.04
Electricity Demand $128,564 6,988 kW-months/year $18.40
Electricity Fees $1,185 - $ -
Natural Gas $21,103 3,177 MMBtu $6.64
TOTAL ENERGY COSTS $225,183
RECOMMENDED SAVINGS* $23,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,358
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,626
Cost:
$14,109
- - $14,626 - - - -
-
kWh
$14,626
-
$
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,025
Cost:
$2,777
$5,025 120,900 - - - - $5,025
120,900
kWh
-
-
$
-
-
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,367
Cost:
$1,665
$1,367 32,899 - - - - $1,367
32,899
kWh
-
-
$
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$962
Cost:
$14
- - - - $962 146 -
-
kWh
-
-
$
$962
146
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$737
Cost:
$871
$737 17,732 - - - - $737
17,732
kWh
-
-
$
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$655
Cost:
$768
$655 15,753 - - - - $655
15,753
kWh
-
-
$
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$612
Cost:
$440
$612 14,724 - - - - $612
14,724
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$23,984
Cost:
$20,644
$8,396 202,008 $14,626 - $962 146 $8,396
202,008
kWh
$14,626
-
$
$962
146
MMBtu
TOTAL IMPLEMENTED Savings:
$9,358
Cost:
$6,535
$8,396 202,008 - - $962 146 $8,396
202,008
kWh
-
-
$
$962
146
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas