IAC logo
IAC Assessment: BS0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Fastening Washers
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 90,000
Annual Production 240,000,000 Pieces
Production Hrs. Annual 2,040
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,306 1,423,359 kWh $0.05
Electricity Demand $31,663 5,078 kW-months/year $6.24
Electricity Fees $2,684 - $ -
Natural Gas $14,623 2,066 MMBtu $7.08
TOTAL ENERGY COSTS $123,276
RECOMMENDED SAVINGS* $6,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$821
Cost:
$196
$821 15,719 - - - - - - $821
15,719
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,699
Cost:
$982
$2,699 51,714 - - - - - - $2,699
51,714
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,462
Cost:
$3,018
$(-152) (-2,909) - - $1,614 244 - - $(-152)
(-2,909)
kWh
-
-
kW-months/year
$1,614
244
MMBtu
-
-
Tgal
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$166
Cost:
$18
$85 1,641 $81 13 - - - - $85
1,641
kWh
$81
13
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$90
Cost:
$22
$81 1,556 $9 1 - - - - $81
1,556
kWh
$9
1
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$74
Cost:
$13
$4 79 - - $70 11 - - $4
79
kWh
-
-
kW-months/year
$70
11
MMBtu
-
-
Tgal
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$648
Cost:
$184
$648 12,408 - - - - - - $648
12,408
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$75
Cost:
$166
$75 1,446 - - - - - - $75
1,446
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 3.4151 MINIMIZE WATER USAGE Savings:
$435
Cost:
$250
- - - - - - $435 309 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$435
309
Tgal
TOTAL RECOMMENDED Savings:
$6,470
Cost:
$4,849
$4,261 81,654 $90 14 $1,684 255 $435 309 $4,261
81,654
kWh
$90
14
kW-months/year
$1,684
255
MMBtu
$435
309
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage