IAC logo
IAC Assessment: BS0086
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0086
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2016
Principal Product Concrete Pipe
NAICS 327332 - Concrete Pipe Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 112
Plant Area (Sq.Ft.) 147,000
Annual Production 100,500 Tons
Production Hrs. Annual 2,730
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,704 1,684,319 kWh $0.04
Electricity Demand $114,001 6,941 kW-months/year $16.42
Electricity Fees $739 - $ -
Natural Gas $75,100 20,641 MMBtu $3.64
TOTAL ENERGY COSTS $255,545
RECOMMENDED SAVINGS* $22,990 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,764
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,315
Cost:
$14,270
- - - - $12,315 - - - -
-
kWh
-
-
kW-months/year
$12,315
-
$
-
-
MMBtu
02: 2.1224 REPLACE BOILER Savings:
$4,643
Cost:
$61,724
$(-3,370) (-86,386) - - - - $8,013 2,525 $(-3,370)
(-86,386)
kWh
-
-
kW-months/year
-
-
$
$8,013
2,525
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,887
Cost:
$280
$2,887 74,009 - - - - - - $2,887
74,009
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,877
Cost:
$1,280
$1,877 48,127 - - - - - - $1,877
48,127
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,268
Cost:
$147
$726 18,261 $542 33 - - - - $726
18,261
kWh
$542
33
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,990
Cost:
$77,701
$2,120 54,011 $542 33 $12,315 - $8,013 2,525 $2,120
54,011
kWh
$542
33
kW-months/year
$12,315
-
$
$8,013
2,525
MMBtu
TOTAL IMPLEMENTED Savings:
$4,764
Cost:
$1,560
$4,764 122,136 - - - - - - $4,764
122,136
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas