IAC logo
IAC Assessment: BS0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2017
Principal Product Window Frames/Door Frames/Molding
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 430
Plant Area (Sq.Ft.) 500,000
Annual Production 34,000,000 Thousand Feet
Production Hrs. Annual 7,464
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,070,790 22,707,155 kWh $0.05
Electricity Demand $317,034 48,269 kW-months/year $6.57
Electricity Fees $4,460 - $ -
Natural Gas $177,296 28,715 MMBtu $6.17
TOTAL ENERGY COSTS $1,569,580
RECOMMENDED SAVINGS* $231,527 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$120,755
Cost:
$55,860
$120,755 2,561,090 - - - - $120,755
2,561,090
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$55,510
Cost:
$60,400
$55,510 1,177,310 - - - - $55,510
1,177,310
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$36,306
Cost:
$482
$36,306 770,017 - - - - $36,306
770,017
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,223
Cost:
$948
$4,223 89,568 - - - - $4,223
89,568
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,010
Cost:
$7,576
$3,898 82,668 $1,112 169 - - $3,898
82,668
kWh
$1,112
169
kW-months/year
-
-
MMBtu
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$72
Cost:
$169
$72 1,519 - - - - $72
1,519
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$444
Cost:
$990
$444 9,423 - - - - $444
9,423
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,363
Cost:
$968
$2,363 50,113 - - - - $2,363
50,113
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$338
Cost:
$198
$338 7,166 - - - - $338
7,166
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,506
Cost:
$20,241
$(-323) (-6,841) - - $6,829 1,108 $(-323)
(-6,841)
kWh
-
-
kW-months/year
$6,829
1,108
MMBtu
TOTAL RECOMMENDED Savings:
$231,527
Cost:
$147,832
$223,586 4,742,033 $1,112 169 $6,829 1,108 $223,586
4,742,033
kWh
$1,112
169
kW-months/year
$6,829
1,108
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas