IAC logo
IAC Assessment: BS0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2018
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $100,000,000-$500,000,000
# of Employees 190
Plant Area (Sq.Ft.) 8,000,000
Annual Production 300,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,802,117 37,618,928 kWh $0.05
Electricity Demand $326,680 85,398 kW-months/year $3.83
TOTAL ENERGY COSTS $2,128,797
RECOMMENDED SAVINGS* $84,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$38,983
Cost:
$1,500
$34,068 709,743 $4,915 1,285 $34,068
709,743
kWh
$4,915
1,285
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$13,971
Cost:
$2,145
$12,204 255,816 $1,767 462 $12,204
255,816
kWh
$1,767
462
kW-months/year
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,787
Cost:
$13,000
$1,230 25,633 $8,557 2,237 $1,230
25,633
kWh
$8,557
2,237
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,785
Cost:
$1,560
$1,785 37,219 - - $1,785
37,219
kWh
-
-
kW-months/year
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,656
Cost:
$1,031
$14,636 304,920 $2,020 528 $14,636
304,920
kWh
$2,020
528
kW-months/year
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,051
Cost:
$2,790
$3,051 63,558 - - $3,051
63,558
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$84,233
Cost:
$22,026
$66,974 1,396,889 $17,259 4,512 $66,974
1,396,889
kWh
$17,259
4,512
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand