IAC logo
IAC Assessment: BS0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2019
Principal Product Waste Water Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 6
Plant Area (Sq.Ft.) 240,000
Annual Production 416,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,995 1,424,875 kWh $0.05
Electricity Demand $20,969 3,119 kW-months/year $6.72
Electricity Fees $3,856 - $ -
Natural Gas $8,498 1,294 MMBtu $6.56
TOTAL ENERGY COSTS $107,317
RECOMMENDED SAVINGS* $18,273 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $113
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$113
Cost:
$50
$104 2,000 $9 1 - - $104
2,000
kWh
$9
1
kW-months/year
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,415
Cost:
$1,176
$22 425 - - $1,393 230 $22
425
kWh
-
-
kW-months/year
$1,393
230
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,158
Cost:
$13,685
$5,558 107,033 $5,363 798 $(-2,763) (-457) $5,558
107,033
kWh
$5,363
798
kW-months/year
$(-2,763)
(-457)
MMBtu
04: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$437
Cost:
$6,000
$437 8,410 - - - - $437
8,410
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$8,150
Cost:
$166,500
$8,150 156,942 - - - - $8,150
156,942
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,273
Cost:
$187,411
$14,271 274,810 $5,372 799 $(-1,370) (-226) $14,271
274,810
kWh
$5,372
799
kW-months/year
$(-1,370)
(-226)
MMBtu
TOTAL IMPLEMENTED Savings:
$113
Cost:
$50
$104 2,000 $9 1 - - $104
2,000
kWh
$9
1
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas