IAC Assessment: BS0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2019
Principal Product Frozen Potato Products
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $100,000,000-$500,000,000
# of Employees 185
Plant Area (Sq.Ft.) 282,000
Annual Production 400,000,000 Pounds
Production Hrs. Annual 7,992
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,237,684 27,921,678 kWh $0.04
Electricity Demand $332,663 51,063 kW-months/year $6.51
Electricity Fees $1,954 - $ -
Natural Gas $5,890,814 1,283,687 MMBtu $4.59
TOTAL ENERGY COSTS $7,463,115
RECOMMENDED SAVINGS* $357,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$341,674
Cost:
$103,307
- - - - $341,674 74,455 -
-
kWh
-
-
kW-months/year
$341,674
74,455
MMBtu
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$4,088
Cost:
$5,932
- - - - $4,088 891 -
-
kWh
-
-
kW-months/year
$4,088
891
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,952
Cost:
$1,038
$5,952 134,265 - - - - $5,952
134,265
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,819
Cost:
$308
$1,514 34,164 $305 47 - - $1,514
34,164
kWh
$305
47
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,574
Cost:
$466
$2,480 55,944 $1,094 168 - - $2,480
55,944
kWh
$1,094
168
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$357,107
Cost:
$111,051
$9,946 224,373 $1,399 215 $345,762 75,346 $9,946
224,373
kWh
$1,399
215
kW-months/year
$345,762
75,346
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas