IAC Assessment: BS0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2020
Principal Product Precision Metal Parts
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $500,000-$1,000,000
# of Employees 47
Plant Area (Sq.Ft.) 42,500
Annual Production 100,000 Pieces
Production Hrs. Annual 5,200
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,533 1,171,680 kWh $0.05
Electricity Demand $18,269 3,353 kW-months/year $5.45
Electricity Fees $1,896 - $ -
Natural Gas $7,683 1,520 MMBtu $5.05
LPG $28 13 MMBtu $2.12
TOTAL ENERGY COSTS $85,409
RECOMMENDED SAVINGS* $17,267 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,313
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,952
Cost:
$4,513
$4,952 100,859 - - - - $4,952
100,859
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$466
Cost:
$319
$160 3,259 - - $306 61 $160
3,259
kWh
-
-
kW-months/year
$306
61
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,058
Cost:
-
$1,058 21,550 - - - - $1,058
21,550
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,837
Cost:
$642
$2,379 48,443 $458 84 - - $2,379
48,443
kWh
$458
84
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,475
Cost:
$2,808
$7,475 152,240 - - - - $7,475
152,240
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$479
Cost:
$1,149
$479 9,760 - - - - $479
9,760
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$17,267
Cost:
$9,431
$16,503 336,111 $458 84 $306 61 $16,503
336,111
kWh
$458
84
kW-months/year
$306
61
MMBtu
TOTAL IMPLEMENTED Savings:
$9,313
Cost:
$5,474
$8,549 174,111 $458 84 $306 61 $8,549
174,111
kWh
$458
84
kW-months/year
$306
61
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas