Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2021
Principal Product Carbide Tooling
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 50,000
Annual Production 340,000 Pieces
Production Hrs. Annual 8,760
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,375 3,614,659 kWh $0.05
Electricity Demand $46,196 7,215 kW-months/year $6.40
Electricity Fees $13,114 - $ -
Natural Gas $4,682 886 MMBtu $5.28
TOTAL ENERGY COSTS $230,367
RECOMMENDED SAVINGS* $11,073 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$2,152
Cost:
$180
$(-38) (-821) - - $2,190 425 $(-38)
(-821)
kWh
-
-
kW-months/year
$2,190
425
MMBtu
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$260
Cost:
$159
$62 1,355 - - $198 39 $62
1,355
kWh
-
-
kW-months/year
$198
39
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$405
Cost:
$579
$405 8,804 - - - - $405
8,804
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2514 COVER OPEN TANKS Savings:
$495
Cost:
$547
$416 9,040 $79 12 - - $416
9,040
kWh
$79
12
kW-months/year
-
-
MMBtu
05: 2.6215 SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON Savings:
$5,985
Cost:
$6,222
$5,985 130,032 - - - - $5,985
130,032
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,776
Cost:
$452
$1,492 32,412 $284 44 - - $1,492
32,412
kWh
$284
44
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$11,073
Cost:
$8,139
$8,322 180,822 $363 57 $2,388 463 $8,322
180,822
kWh
$363
57
kW-months/year
$2,388
463
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas