IAC logo
IAC Assessment: BS0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2021
Principal Product Dimensional Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $100,000,000-$500,000,000
# of Employees 79
Plant Area (Sq.Ft.) 2,178,000
Annual Production 250,000,000 Units
Production Hrs. Annual 6,000
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,448,477 25,277,909 kWh $0.06
Electricity Demand $247,731 51,946 kW-months/year $4.77
TOTAL ENERGY COSTS $1,696,208
RECOMMENDED SAVINGS* $82,443 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,842
Cost:
$306
$7,564 132,000 $1,278 268 - - $7,564
132,000
kWh
$1,278
268
kW-months/year
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,250
Cost:
$6,500
$1,227 21,420 $1,022 214 - - $1,227
21,420
kWh
$1,022
214
kW-months/year
-
-
$
03: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$46,312
Cost:
$106,140
- - - - $46,312 - -
-
kWh
-
-
kW-months/year
$46,312
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$22,793
Cost:
$7,115
- - - - $22,793 - -
-
kWh
-
-
kW-months/year
$22,793
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,246
Cost:
$3,700
$1,330 23,220 $916 192 - - $1,330
23,220
kWh
$916
192
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$82,443
Cost:
$123,761
$10,121 176,640 $3,216 674 $69,105 - $10,121
176,640
kWh
$3,216
674
kW-months/year
$69,105
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost