Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of North Carolina, Charlotte |
---|---|
Assessment Year | 2022 |
Principal Product | Bread |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 210,000 |
Annual Production | 60,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $510,843 | 9,407,520 | kWh | $0.05 |
Electricity Demand | $145,329 | 12,129 | kW-months/year | $11.98 |
Electricity Fees | $560 | - | $ | - |
Natural Gas | $391,268 | 46,677 | MMBtu | $8.38 |
TOTAL ENERGY COSTS | $1,048,000 | |||
RECOMMENDED SAVINGS* | $132,060 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $38,944 Cost: - |
$26,796 | 493,480 | $12,148 | 1,014 | - | - |
$26,796 493,480 kWh |
$12,148 1,014 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $18,525 Cost: $10,000 |
$13,666 | 251,675 | $4,859 | 406 | - | - |
$13,666 251,675 kWh |
$4,859 406 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING |
Savings: $4,544 Cost: $10,000 |
- | - | - | - | $4,544 | 542 |
- - kWh |
- - kW-months/year |
$4,544 542 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,343 Cost: $16,000 |
$12,343 | 227,321 | - | - | - | - |
$12,343 227,321 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE |
Savings: $3,233 Cost: - |
$3,233 | 59,541 | - | - | - | - |
$3,233 59,541 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE |
Savings: $7,230 Cost: $30,000 |
- | - | - | - | $7,230 | 863 |
- - kWh |
- - kW-months/year |
$7,230 863 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $47,241 Cost: $125,000 |
- | - | - | - | $47,241 | 5,636 |
- - kWh |
- - kW-months/year |
$47,241 5,636 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $132,060 Cost: $191,000 |
$56,038 | 1,032,017 | $17,007 | 1,420 | $59,015 | 7,041 | $56,038 1,032,017 kWh |
$17,007 1,420 kW-months/year |
$59,015 7,041 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |