IAC logo
IAC Assessment: CC0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2024
Principal Product bottled water
NAICS 312112 - Bottled Water Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 165
Plant Area (Sq.Ft.) 495,000
Annual Production 1,000,000,000 Units
Production Hrs. Annual 8,760
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,757,543 45,448,670 kWh $0.04
Electricity Demand $797,435 64,820 kW-months/year $12.30
Electricity Fees $571,710 - $ -
Natural Gas $80,816 6,329 MMBtu $12.77
TOTAL ENERGY COSTS $3,207,503
RECOMMENDED SAVINGS* $249,156 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$14,256
Cost:
$2,000
$14,256 365,577 - - $14,256
365,577
kWh
-
-
kW-months/year
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$32,890
Cost:
$17,600
$22,970 588,968 $9,920 806 $22,970
588,968
kWh
$9,920
806
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$20,745
Cost:
-
$14,486 371,424 $6,259 509 $14,486
371,424
kWh
$6,259
509
kW-months/year
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$138,413
Cost:
$947,200
$96,650 2,478,204 $41,763 3,395 $96,650
2,478,204
kWh
$41,763
3,395
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,675
Cost:
-
$15,135 388,068 $6,540 531 $15,135
388,068
kWh
$6,540
531
kW-months/year
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,947
Cost:
-
$4,851 124,392 $2,096 170 $4,851
124,392
kWh
$2,096
170
kW-months/year
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,562
Cost:
$2,120
$5,979 153,300 $2,583 210 $5,979
153,300
kWh
$2,583
210
kW-months/year
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$5,668
Cost:
$93,870
$5,668 145,337 - - $5,668
145,337
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$249,156
Cost:
$1,062,790
$179,995 4,615,270 $69,161 5,622 $179,995
4,615,270
kWh
$69,161
5,622
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand