Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of California, Irvine |
---|---|
Assessment Year | 2023 |
Principal Product | Aircraft Parts Maintenance |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 43 |
Plant Area (Sq.Ft.) | 18,000 |
Annual Production | 8,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $67,397 | 429,858 | kWh | $0.16 |
Electricity Demand | $19,797 | 3,496 | kW-months/year | $5.66 |
Electricity Fees | $11,610 | - | $ | - |
Natural Gas | $4,285 | 147 | MMBtu | $29.15 |
TOTAL ENERGY COSTS | $112,164 | |||
RECOMMENDED SAVINGS* | $135,971 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Water Usage | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $70,514 Cost: $548,740 |
$66,235 | 422,415 | $4,279 | 756 | - | - | - | - |
$66,235 422,415 kWh |
$4,279 756 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $42,450 Cost: $24,000 |
$11,250 | 71,744 | - | - | - | - | $31,200 | - |
$11,250 71,744 kWh |
- - kW-months/year |
- - Tgal |
$31,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $10,792 Cost: $2,500 |
$10,792 | 68,826 | - | - | - | - | - | - |
$10,792 68,826 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $6,992 Cost: $8,890 |
$6,992 | 44,591 | - | - | - | - | - | - |
$6,992 44,591 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $1,769 Cost: $3,500 |
$1,769 | 11,283 | - | - | - | - | - | - |
$1,769 11,283 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,444 Cost: $200 |
$1,444 | 9,210 | - | - | - | - | - | - |
$1,444 9,210 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,159 Cost: $1,500 |
- | - | - | - | $1,159 | 117 | - | - |
- - kWh |
- - kW-months/year |
$1,159 117 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $851 Cost: $1,500 |
$776 | 4,951 | $75 | 13 | - | - | - | - |
$776 4,951 kWh |
$75 13 kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $135,971 Cost: $590,830 |
$99,258 | 633,020 | $4,354 | 769 | $1,159 | 117 | $31,200 | - | $99,258 633,020 kWh |
$4,354 769 kW-months/year |
$1,159 117 Tgal |
$31,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Usage | Personnel Changes | Electricity Usage | Electricity Demand | Water Usage | Personnel Changes |