IAC logo
IAC Assessment: CM1017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2023
Principal Product Dimensional Graphics
NAICS 313210 - Broadwoven Fabric Mills
SIC 2261 - Finishing Plants, Cotton
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 58,700
Annual Production 120,000 Pieces
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,157 687,840 kWh $0.05
Electricity Demand $62,014 3,145 kW-months/year $19.72
Electricity Fees $6,954 - $ -
Natural Gas $25,171 2,975 MMBtu $8.46
TOTAL ENERGY COSTS $125,296
RECOMMENDED SAVINGS* $40,193 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$4,638
Cost:
$57,344
$1,582 34,915 $3,056 155 - - - - $1,582
34,915
kWh
$3,056
155
kW-months/year
-
-
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$738
Cost:
-
$738 16,304 - - - - - - $738
16,304
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$1,890
Cost:
$15,750
$687 15,163 $1,203 61 - - - - $687
15,163
kWh
$1,203
61
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1224 REPLACE BOILER Savings:
$20,045
Cost:
$41,481
$(-554) (-12,230) $(-464) (-24) $21,063 2,490 - - $(-554)
(-12,230)
kWh
$(-464)
(-24)
kW-months/year
$21,063
2,490
MMBtu
-
-
$
05: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$1,538
Cost:
$4,396
$104 2,307 - - $1,434 169 - - $104
2,307
kWh
-
-
kW-months/year
$1,434
169
MMBtu
-
-
$
06: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$9,880
Cost:
$2,306
- - - - - - $9,880 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,880
-
$
07: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$1,464
Cost:
$3,500
$(-98) (-2,156) $(-291) (-15) $1,853 219 - - $(-98)
(-2,156)
kWh
$(-291)
(-15)
kW-months/year
$1,853
219
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$40,193
Cost:
$124,777
$2,459 54,303 $3,504 178 $24,350 2,878 $9,880 - $2,459
54,303
kWh
$3,504
178
kW-months/year
$24,350
2,878
MMBtu
$9,880
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes