IAC logo
IAC Assessment: CM1023
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2023
Principal Product Fiberglass and Resin Conduit
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 44,000
Annual Production 43,160 Units
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,152 1,290,000 kWh $0.08
Electricity Demand $58,800 2,395 kW-months/year $24.55
Electricity Fees $12,605 - $ -
Natural Gas $78,785 10,014 MMBtu $7.87
TOTAL ENERGY COSTS $250,342
RECOMMENDED SAVINGS* $36,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$25,746
Cost:
$250,973
$25,746 331,627 - - - - - - - - $25,746
331,627
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,710
Cost:
$400
$1,946 25,081 $1,764 72 - - - - - - $1,946
25,081
kWh
$1,764
72
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,313
Cost:
$105
- - - - $1,169 149 $144 12 - - -
-
kWh
-
-
kW-months/year
$1,169
149
MMBtu
$144
12
Tgal
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$425
Cost:
$365
- - - - $425 54 - - - - -
-
kWh
-
-
kW-months/year
$425
54
MMBtu
-
-
Tgal
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,008
Cost:
$8,000
- - - - - - - - $5,008 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,008
-
$
TOTAL RECOMMENDED Savings:
$36,202
Cost:
$259,843
$27,692 356,708 $1,764 72 $1,594 203 $144 12 $5,008 - $27,692
356,708
kWh
$1,764
72
kW-months/year
$1,594
203
MMBtu
$144
12
Tgal
$5,008
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Usage Administrative Changes