IAC Assessment: CM1025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2023
Principal Product Custom metal and poly parts/products.
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 44,000
Annual Production 10,000 Units
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,644 1,229,440 kWh $0.05
Electricity Demand $49,300 2,565 kW-months/year $19.22
Electricity Fees $13,988 - $ -
Natural Gas $5,133 477 MMBtu $10.77
TOTAL ENERGY COSTS $126,065
RECOMMENDED SAVINGS* $49,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$34,270
Cost:
$526,058
$32,056 683,695 $2,214 115 $32,056
683,695
kWh
$2,214
115
kW-months/year
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$5,141
Cost:
$28,827
$3,796 80,941 $1,345 70 $3,796
80,941
kWh
$1,345
70
kW-months/year
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,196
Cost:
$889
$2,295 48,942 $3,901 203 $2,295
48,942
kWh
$3,901
203
kW-months/year
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,954
Cost:
$22,704
$1,892 40,338 $1,062 55 $1,892
40,338
kWh
$1,062
55
kW-months/year
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,162
Cost:
$2,172
$1,162 24,779 - - $1,162
24,779
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$49,723
Cost:
$580,650
$41,201 878,695 $8,522 443 $41,201
878,695
kWh
$8,522
443
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand